Waltz Construction added 5,400 SF to the existing High School Weight room. The new space features roll-up doors, opening up to new turf exterior area. The interior space allows for active educational use and other school functions. The project scope also included constructing a new canopy walkway that ties the existing building to new space, re-routing existing storm drain lines and replacing site concrete.
WILLIAMS FIELD HIGH SCHOOL
Gilbert, AZ
Location: Gilbert, AZ
Project Size: 5,400 SF
Duration:
Delivery Method: CMAR