Ground-up construction of 112 unit luxury condominiums. In addition to its living areas, the Portico scope also includes an outdoor pool, a clubhouse, and a state-of-the-art fitness center.
Post Type Archives: Projects
PORTICO NORTH SCOTTSDALE
THE COMMONS OF MESA
Mesa, AZ
DRIFTWOOD GOLF CLUB
Located in the rolling hills of Texas, Waltz is constructing a Golf and Ranch Club. Situated on 800 acres, this massive project will feature a magnificent 18-hole golf course, 70+ acres of vineyards, world-class clubhouse facilities, cozy cabins, and comfy bungalows. Driftwood Golf and Ranch Club is where country life meets luxury.
ASCENT GYMNASIUM
The project scope for Ascent Classical Academy’s new Northern Colorado campus features an gymnasium fit for indoor sports and large gatherings.
IMAGINE GYMNASIUM
The expansion of Imagine International Academy of North Texas is a Gymnatorium including dressing rooms, restrooms, offices, and storage. The high-quality gym features a performance stage and plenty of retractable stadium seating for spectators.
INTERNATIONAL LEADERSHIP OF TEXAS KELLER-SAGINAW
Fort Worth, TX
International Leadership of Texas called upon Waltz to complete an expansion on their Keller-Saginaw High School campus. The project consists of a 32,000 SF addition including 16 standard classrooms, science lab classrooms, and JROTC wing to include an indoor gun range. The expansion will offer more classroom space to a growing student population while providing […]
ASCENT CLASSICAL ACADEMY
Windsor, CO
Waltz performed the ground-up construction of 39,900 SF school at a brand new campus location set in gorgeous Northern Colorado. The new facility sits on 14 spacious acres, and will allow the previous K-6 grades to expand to K-9 in 2021 and eventually all the way to K-12.
IMAGINE INTERNATIONAL ACADEMY
McKinney, TX
Imagine International Academy of North Texas kicked off its campus expansion with a Gymnatorium. The 15,000 SF project includes a gym, stage, dressing rooms, restrooms, offices, and storage. External site elements consist of paving, parking, and landscaping.
BASIS PHOENIX SOUTH
Phoenix, AZ
BASIS Phoenix South Primary called for a brand new charter school. Waltz constructed a pre-engineered metal building with structural wood framing and EIFS facade. The campus includes classrooms, a full kitchen, multi-purpose room, and play area.
TEMPE PREPARATORY ACADEMY
Tempe, AZ
In addition to being the largest and most prominent building on the campus, the Fine Arts and Sciences Building will have the distinction of being home to administrative offices, a 400+ seat auditorium, a STEAM learning center, and exceptional arts and science classrooms.
BOURBON STEAKHOUSE AT THE FAIRMONT
MOON VALLEY COUNTRY CLUB
FOOD BAR
EDGE BAR AT SANCTUARY
ASU ALAMEDA WAREHOUSE
ASU CENTRAL PLANT UPGRADES
ASU VAIANA LABS UPGRADES
ASU ARTS & SCIENCES BUILDING
ASU OLD MAIN
ASU SUN DEVIL STADIUM UPGRADES
ASU LIFE SCIENCES
ASU CRITICAL POWER UPGRADES
AMS FIELDS & GYMNASIUM
The project scope for Academies of Math & Science included an indoor gymnasium, two exterior playgrounds with surrounding turf, and one large athletic field.
PAN-AMERICAN GYMNASIUM
The scope of Pan-American Charter School included a full-size competitive gymnasium with a custom logo and decals on the hard floor.
BASIS SCOTTSDALE GYMNASIUM
HAWKING 1
Chula Vista, CA
Hawking Phase II continues work that began in 2018 with the conversion of an 50+ year old Lutheran Church into a charter school. In Phase 2, Waltz demolished three houses to make room for an exterior basketball court with new lighting and site work including a new playground and landscape. In addition to the site […]
BENJAMIN FRANKLIN PERFORMING ARTS BUILDING
Queen Creek, AZ
This project called for the addition of a brand new 26,000 SF Performing Arts building on the already existing campus. The auditorium is equipped with a full stage, 856 seats, dressing and rehearsal rooms, an orchestra pit, and a full sound, rigging, lighting, and video package. A reception lobby, classrooms, and administration space were also […]
PAN-AMERICAN COLLEGE PREP
Phoenix, AZ
Pan-American Charter School is a new ground-up K-12 school. The project consists of two separate buildings, a K-8 two-story building, and a one-story high school building totaling 91,892 SF. There were associated site improvements including a full gymnasium, cafeteria, full kitchen, administration offices, two full-size soccer fields, basketball courts, outdoor learning facilities, and athletic areas.
SAN ANTONIO PREP
San Antonio, TX
Waltz erected a 27,00 SF college prep school on 10 acres of land in San Antonio. School facilities include 24 classrooms and offices, a full-size kitchen and cafeteria, a multi-purpose media room, and four separate outdoor areas for play, eating, and learning.
ACADEMIES OF MATH AND SCIENCE
Glendale, AZ
The 8.5-acre site school project involves ground up construction of mostly single-story 84,000 square feet construction for 1,400 students. The site features include a gym, a full turf field, various on-site improvements, and a steel basketball exterior structure.
SANDERS UNIFIED SCHOOL DISTRICT
Sanders, AZ
Waltz worked with Sanders Unified School District on their campus improvements. These projects included the installation of a new wastewater treatment facility and disposal fields, new water well and decommissioning and removal of an existing wastewater treatment facility.
PHOENIX UNION HIGH SCHOOL DISTRICT
Phoenix, AZ
Waltz has been working with PUHSD on their JOC projects since 2017. These projects include a variety of construction, renovation and tenant improvement across 5 PUHSD occupied campuses. We have worked at Bostrum High School, Central High School, Maryvale High School, and South Mountain High School.
WILLIAMS FIELD HIGH SCHOOL
Gilbert, AZ
Waltz Construction added 5,400 SF to the existing High School Weight room. The new space features roll-up doors, opening up to new turf exterior area. The interior space allows for active educational use and other school functions. The project scope also included constructing a new canopy walkway that ties the existing building to new space, […]
PROMESA CHARTER SCHOOL
San Antonio, TX
The Promesa Academy Charter school project includes 26,000 SF of a combination of modular and ground-up construction. The facility supports classrooms, offices, cafeteria, warming kitchen, covered pavilion, community space, art, and music rooms. The outside features learning areas and play areas, small play-fields, and playscapes, parking, driveways, street safety flashers.
VALLEY LUTHERAN
Phoenix, AZ
17,000 SF, 2-story addition that included 10 classrooms, 2 labs, and a music room on an occupied high school campus. The original roof structure of the classroom addition was designed to match the height of the gymnasium. This design would create windsails and affect the structural integrity. The Waltz team met with the architect, the […]
CHRIST LUTHERAN SCHOOL
Phoenix, AZ
An 11,240 SF classroom building addition/renovation and a 17,536 SF renovation to an existing classroom and multipurpose space on an active PreK-8 campus. Waltz worked closely with the facilities manager to select the accessories, low voltage, hardware and kitchen equipment that were best suited for the facility’s needs, usage and according to the life-cycle goals […]
SEQUOIA VILLAGE SCHOOL
Mesa, AZ
New 20,000 SF K-12 facility that is a wood frame expansion to an existing campus. The project consists of a gymnasium, performance stage, full-service kitchen, administration offices, nurse’s office, science classrooms, standard classrooms, and boys and girls locker rooms and restrooms.
GLENVIEW COLLEGE PREPARATORY HIGH SCHOOL
Phoenix, AZ
Waltz partnered with the architect on this project to design a space that would be both welcoming and functional to the students. The construction included classrooms, science labs, and a multi-purpose gymnasium. Also featured on the new campus is a shaded outdoor eating area, performance platform, interior bleachers, and an outdoor basketball court.
PIONEER PREPARATORY SCHOOL
Phoenix, AZ
A new K-8 charter with accompanying recreational improvements, including ball fields, landscaping, hardscaping, lighting, retention basins, basketball courts, natural and synthetic turf, as well as a learning outdoor auditorium. Waltz also developed parking and associated site areas.
RIDGELINE ACADEMY
Phoenix, AZ
A 45,000 SF school on a 7-acre campus in northwest Phoenix has a 650 student capacity to serve students in grades K–8. The building houses 28 classrooms plus common facilities in a 2 story building. Waltz was given a prototype and reduced the square footage to maximize efficiency by eliminating unneeded circulation and support spaces. […]
LEGACY PREPARATORY CHARTER SCHOOL
Mesquite, TX
Waltz provided turnkey Project Management and design/build services to Legacy Preparatory Charter Academy in Mesquite, TX. This new, 64,000 SF K-12 school includes a 34,000 SF 2-story ground-up facility and a 30,000 SF renovation of an existing building. The project includes administration, special education, science labs, primary and secondary classrooms, as well as a cafenasium, […]
IMAGINE DESERT WEST MIDDLE SCHOOL
Phoenix, AZ
Imagine Desert West Middle School called for the addition of 41,168 SF to the existing Phoenix campus. The fast-tracked build included a two-story building constructed with structural wood framing, EIFS facade, and fully equipped with classrooms, library, labs, cafeteria, teacher’s lounge, gymnasiums playground, and athletic fields.
BASIS SCOTTSDALE
Scottsdale, AZ
The Waltz Team provided new construction in 3.5-month turnaround time on a 2-story Pre-Engineered Metal Building with integral color block & EIFS Facade with classrooms. The project also included offices, gym, laboratories, and a basketball and play area. This project’s demolition phase included asbestos abatement and required rigorous utility coordination with APS, Cox, and Century […]
BASIS SAN ANTONIO
San Antonio, TX
Waltz completed remodels on both campuses of BASIS San Antonio Primary—the Medical Center campus and the North Central campus. These renovations consisted of changing existing classrooms into kindergarten rooms, science classrooms into regular classrooms, and modified an existing multi-purpose room into a separate multi-purpose room. In addition to this, Waltz added a new playground and […]
WESTERN SCHOOL OF SCIENCE AND TECHNOLOGY
Phoenix, AZ
A 42,000 SF school addition on an active campus that serves 800 students in grades 7 through 12, and includes a full-sized multipurpose gymnasium. Waltz used value engineering to save the Owner over $25,000 using high-quality carpet tile overruns. The team also saved the Owner over $50,000 by redistributing the excess cooling load, which resulted […]